| Management number | 217950927 | Release Date | 2026/05/03 | List Price | $9.98 | Model Number | 217950927 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
Slim type 2-hole file for easy operation and tightness Great for presentations 5 pack Uses a new snap closure mechanism. Firmly filing up to 100 sheets 0.01 inch (0.3 mm) thick transparent P.P. cover allows you to check the documents inside without opening it.
| Color | Milky White |
|---|---|
| Style | Binding thickness: 0.4 inches (10 mm). |
| Tab Cut | 1/3 Cut |
| Brand Name | LIHIT LAB |
| Paper Size | A4 |
| Manufacturer | Pilot |
| Tab Position | トップ |
| Material Type | Polypropylene (PP) |
| Fastener Capacity | 100 sheets |
| Number Of Pockets | 5 |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form